The first page of the Project Wizard captures the the details for the project being created. Ever project requires a Project Code and Description. If the RMTrack Site Option for Issue Numbering uses "sequentially within project", then a unique Numbering Prefix is required for each project.
Every Project requires a Data Entry Form and a Workflow. These can be unique to a project or shared by projects.